FL HVAC Code Permit and Efficiency Rules

The FL HVAC Code Permit and Efficiency Rules carries 2 published figures read from 2 sources' own pages, from 0.52 to 233.82 USD, read 7 November 2026.

0.52 to 233.82 USD Range of the published figures 2 published figures, not one market: read the rows
2 Published figures from 2 source pages, read 8 Nov 2026
2 of 23 Sources read that publish one 9% publish a figure at all
  1. Miami-Dade mechanical fee sheet233.82 USD
  2. Broward County administrative code Chapter 43 - fees and other charges0.52 USD
Every published figure, highest first.
Table view
RowValue
Miami-Dade mechanical fee sheet233.82 USD
Broward County administrative code Chapter 43 - fees and other charges0.52 USD

2 of the 23 named sources read in full publish a figure; 21 publish none, read 7 November 2026.

By county

BreakdownMedianRangeSources
county Broward0.52 USD (one figure)one figure, no range1
county Miami-Dade233.82 USD (one figure)one figure, no range1

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
Miami-Dade mechanical fee sheet233.82 USDMiami-Dade2026-11-07
Broward County administrative code Chapter 43 - fees and other charges0.52 USDBroward2026-11-07
The sentence each figure was read from (2)
  • Miami-Dade mechanical fee sheet, read 2026-11-07: Minimum fee for mechanical permits is $233.82.
  • Broward County administrative code Chapter 43 - fees and other charges, read 2026-11-07: A fee equal to the greater of $2.00 or $0.52 for each $1,000.00, or any fraction thereof, of "Total Construction Cost" shall be collected for any building, electrical, plumbing, mechanical, engineering, and liquefied petroleum permit issued, including but not limited to permits issued for alteration, repair, installation, and demolition.

Read in full, publishes no figure

21 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

2 of the 23 named sources that could be read published a usable figure; 21 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in USD (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 247 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per rule with its authority and effective date, quoted verbatim: the southeast regional minimum SEER2 for split systems above and below 45,000 Btu from 10 CFR 430.32, the installation-date rule that decides whether stock equipment may still be fitted, the Florida Building Code Mechanical provisions a change-out is inspected against, the statutory permit and inspection duty, and one mechanical permit fee per county read from that county's own adopted schedule; the derivation nobody publishes is the COUNTY SPREAD - the same job's permit cost from Miami-Dade's percentage-of-value basis to Broward's $0.52 per $1,000 to Jacksonville's flat minimum - and changed-since, which is the news on a code edition or a standard's compliance date

247 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (23)
Cite or embed this figure

The FL HVAC Code Permit and Efficiency Rules carries 2 published figures read from 2 sources' own pages, from 0.52 to 233.82 USD, read 7 November 2026.

2 of the 23 named sources read in full publish a figure; 21 publish none, read 7 November 2026.

FL HVAC Code Permit and Efficiency Rules, county Broward: median 0.52 USD across 1 source, read 7 November 2026.

FL HVAC Code Permit and Efficiency Rules, county Miami-Dade: median 233.82 USD across 1 source, read 7 November 2026.

Cite as: "floridahvacreplacementcost.com FL HVAC Code Permit and Efficiency Rules", updated 2026-11-08, https://floridahvacreplacementcost.com/datasets/fl-hvac-code-permit-and-efficiency-rules/.

Embed this figure (plain HTML, no scripts)

0.52 to 233.82 USD

2 published figures, FL HVAC Code Permit and Efficiency Rules, across 2 sources, read 7 November 2026

Source: floridahvacreplacementcost.com FL HVAC Code Permit and Efficiency Rules

Machine-readable: JSON, CSV, Markdown.

Download the CSV (2 rows, computed 2026-11-08)

Get AC replacement quotes

Two minutes of questions and licensed local HVAC contractors price your actual job. Free, no obligation.

Your system

What are you replacing?

Condos often need association approval and may limit equipment placement.

  • Free, no obligation
  • Your details go to at most three contractors
  • Takes about two minutes

Questions this data answers

What do the federal efficiency standard, the Florida Building Code and my county's permit schedule force into an HVAC replacement, and what do they add to the price?

The FL HVAC Code Permit and Efficiency Rules carries 2 published figures read from 2 sources' own pages, from 0.52 to 233.82 USD, read 7 November 2026.

Where do the figures in the FL HVAC Code Permit and Efficiency Rules come from?

Every figure is quoted from its source's own page and dated (last read 7 Nov 2026). 23 named sources were read and 2 publish a figure; the 21 that publish none are recorded as not published, never estimated.

Get AC quotes